DEC 11/45 build - advice sought, parts requested possibly.

Jay West jwest at classiccmp.org
Fri Jul 8 17:17:43 CDT 2005


Ok, so the obvious question is...

If I add a 2nd bay.....

1) How unobtanium are the parts necessary to bolt the two H960 racks 
together?
2) Can the MF11-L be present in the machine along with the M7891 in the BA11 
(in the 2nd rack)? Can both the core and the semiconductor be used at the 
same time? Or do I need to pull the core boards out of the MF11 to use the 
M7891 in the BA11?

Jay 



More information about the cctalk mailing list