>@[367,367]AUTOIN
RSX-11M/M-PLUS Auto-Install Procedure V1.1

          10-MAR-21    07:01:02


Type "?" for help; CTRL/Z to end; or valid input.

Which product(s) do you want to install? C81

Type "?" for help; CTRL/Z to exit Auto-Install; or valid input.

Where are the update files located <DU0:>? 

Type "?" for help; CTRL/Z to skip this product; or valid input.

Which device are the distribution files for C81 (C81) located on (include colon)
? MU1:

BRU - Starting Tape 1 on MU1:

BRU - End of Tape 1 on MU1:

BRU - Completed

Products being installed:
    Device      Product Task name
    ------      ------- ---------
    MU1:        C81     (C81)

Determining system configuration.

BRU - Starting Tape 1 on MU1:

BRU - End of Tape 1 on MU1:

BRU - Completed

WARNING -- no updates found for configuration data file; procedure continuing.

Do you want to customize C81 (C81) (Y/N) <N>? Y

Where do you want to store the installation files <SY0:>? 

Which directory do you want the COBOL tasks assigned to ([X,Y]) <[1,54]>? [3,54]

Generate CIS or NONCIS code <CIS, NONCIS, UNKNOWN> <UNKNOWN>? NONCIS

Change the default of any of the compiler switches <NO>? 

Build which of the COBOL-81 OTS resident libraries <NONE, CIS, NONCIS, BOTH> <NO
NE>? BOTH

Allow future customization of this file <YES>? 

Allow future customization of this file <YES>? 

Print release notes automatically <NO>? 

Print the installation log automatically <NO>? 

Delete optional installation files <YES>? 


Do you want to customize C81 (C81) again (Y/N) <N>?  

Installation of C81 (C81) beginning at 10-MAR-21 07:03:15

Reading C81C81.CFG.

C81 (C81) must be installed from a distribution kit because
optional installation files may have been deleted.  Please verify
that your distribution kit is placed on a device and indicate
which device it is located on (including colon).  An example of
valid input is:

        MM0:

Type "?" for help; CTRL/Z to end; RETURN to accept default
(given in <>); or valid input.

Which device is the distribution kit located on (include colon) <MU1:>?  

Type "T" for tape, "D" for disk,  CTRL/Z to end; or RETURN to accept default
(given in <>).

What type of kit is this <T/D> <T>?

ALL -- Device mounted 
MOU - volume already mounted
Transferring kit files to work area.

BRU - Starting Tape 1 on MU1:

BRU - End of Tape 1 on MU1:

BRU - Completed

BRU - Starting Tape 1 on MU1:

BRU - End of Tape 1 on MU1:

BRU - Completed

DMO -- TT0:    dismounted from MU1:    *** Final dismount initiated ***
07:03:49  *** MU1:  -- Dismount complete
Updating kit files.


 Begin Update process for COBOL-81 V3.1 software
 on 10-MAR-21 at 07:03:49.

        Update the compiler object module library.

LBR DU0:[367,100]C81BLD/RP=DU0:[215,200]C81COMUPD.OBS
Module "FLCHK " replaced


 Finished with Update process for COBOL-81 V3.1 software
 on 10-MAR-21 at 07:03:49.

Building product C81 (C81).

       Building the COBOL-81 compiler...

       Copying built components to the appropriate places.

       Building resident libraries if requested.

PIP -- No such file(s)
LB:[1,1]C81LIB.TSK;*
PIP -- No such file(s)
LB:[1,1]C81LIB.STB;*
PIP -- No such file(s)
LB:[1,1]C81CIS.TSK;*
PIP -- No such file(s)
LB:[1,1]C81CIS.STB;*
       Installing COBOL-81 tasks.

REM -- Task not in system
REM -- Task not in system
REM -- Task not in system
       Now compile and task-build the
       installation certification program.

Transferring files from work area.

Running IVP command procedure C81IVP.CMD.

 
****************************************************
**      This is the COBOL-81 installation         **
**  certification procedure.  If the messages:    **
**                                                **
**              C81IC1 has passed.                **
**                                                **
**              C81IC2 has passed.                **
**                                                **
**  follow this message, then the installation    **
**  of COBOL-81 V3.1-00 was successful; otherwise,**
**        the installation was unsuccessful.      **
****************************************************
 
C81IC1 has passed.
 
C81IC2 has passed.
 
****************************************************
**  End of installation certification procedure.  **
****************************************************
 

Installation of C81 (C81) ending at 10-MAR-21 07:06:55.

Installation of C81 (C81) successful.

Auto-Install ended on 10-MAR-21 at 07:06:56.

>
