R I C H A R D W I T T E N O O M A N D AS S O C I A T E S P T Y L T D ------------------------------------------------------------------------------ IMAGINARY DREAM SUBDIVISION NO. 1 [HDD: 02:39 PM 17-JUL-85] [HDX: 02:51 PM 17-JUL-85] [HDX: 02:55 PM 17-JUL-85] [HDD: 07:35 PM 17-Jul-85] HARDY CROSS PIPE NETWORK ANALYSIS node elevation (m) residual head (m) consumption assigned (l/sec) 1 100.00 0.000 0.0 2 0.00 98.897 0.0 3 0.00 98.251 0.0 4 0.00 98.093 2.0 5 0.00 98.180 1.0 6 0.00 98.050 2.0 7 0.00 98.030 2.0 8 0.00 98.074 1.0 9 0.00 98.029 2.0 10 0.00 98.006 2.0 pipe node 1 node 2 flow (l/sec) hydr. gradient velocity (m/s) 1 1 2 12.000 0.010502 0.978 2 2 3 6.818 0.003690 0.556 3 3 4 4.622 0.001798 0.377 4 5 2 -5.182 -.002221 -0.422 5 6 3 -2.195 -.001343 -0.279 6 4 7 2.622 0.000630 0.214 7 6 5 1.762 0.000894 0.224 8 6 7 0.475 0.000079 0.060 9 5 8 2.420 0.001608 0.308 10 9 6 -1.483 -.000650 -0.189 11 7 10 1.097 0.000372 0.140 12 9 8 -1.420 -.000600 -0.181 13 9 10 0.903 0.000260 0.115